Rules and paperwork differ between states and towns, so use this as a general guide and check local requirements with your municipality or panchayat and your engineer.
1
Land and documents
- Check the title deed and get an encumbrance certificate for the plot.
- Confirm the land is approved for residential use.
- Get the boundaries measured and marked by a surveyor.
2
Soil test and design
- Get a soil test so the engineer can choose the right foundation.
- Finalise the floor plan with an architect or designer.
- Get a structural design (columns, beams, footings, slab) from a qualified engineer.
3
Approvals and budget
- Apply for building plan approval from your local authority (municipality or panchayat).
- Make a full budget including approvals, connections and a 10–15% reserve.
- Collect at least two written quotes and agree a stage-wise payment schedule.
4
Site preparation
- Arrange temporary water and electricity for construction.
- Clear and level the site; set out the house on the ground as per the drawings.
- Plan safe storage for cement, steel and tools.
5
Foundation and plinth
- Excavate to the depth in the structural drawings.
- Do anti-termite treatment before the foundation and floor.
- Lay the plinth and a damp-proof course (DPC) to stop moisture rising into walls.
- Cure concrete properly by keeping it wet for the period your engineer specifies.
6
Structure
- Columns, beams and the roof slab as per the structural drawings.
- Ask the engineer to check steel reinforcement before every concrete pour.
- Keep formwork in place and cure the slab for as long as the engineer advises.
7
Walls and roof
- Build walls with good-quality blocks or bricks and proper mortar joints.
- Fix door and window frames as walls go up.
- Waterproof the terrace and make sure rainwater drains away.
8
Electrical and plumbing (before plaster)
- Lay conduits for wiring, switchboards and fan points.
- Lay water supply and drain pipes; pressure-test them before closing walls.
- Waterproof bathroom floors and walls before tiling.
9
Plaster, flooring and finishes
- Plaster walls and ceilings, then cure.
- Lay floor and wall tiles; fix kitchen platform and fittings.
- Fit doors, windows, grills and paint.
10
Final connections and moving in
- Get permanent water, electricity and sewer or septic connections.
- Apply for a completion or occupancy certificate if your area requires one.
- Do a final walk-through and make a list of fixes before final payment.
The two steps never to skip: a structural design from a qualified engineer, and getting that engineer to check the steel before each concrete pour. They protect your family for the life of the house.