A HOME TO CALL OURS
Planning guide

Vastu basics for a small house

The most common Vastu recommendations, room by room — and how to apply them sensibly when your plot is small.

Updated October 2026 · About 5 minutes to read

Vastu Shastra is a traditional Indian system of architecture that links the layout of a home to the directions and the natural elements. Many families in India like their home to follow it, and builders and architects are used to working with it. Practices vary between regions and experts, so treat this as a starting point and talk to a Vastu consultant if exact compliance matters to you.

Room-by-room summary

SpaceCommonly recommended directionPractical note
Main entranceNorth, east or north-eastA well-lit entrance that is easy to find is good design in any tradition.
KitchenSouth-east (north-west as an alternative)Morning light in the kitchen; keep it next to the dining area and close to the water line.
Main bedroomSouth-westOften the quietest corner, away from the street.
Puja / prayer roomNorth-eastA calm, clean corner; can double as a study nook.
Bathrooms / toiletsWest or north-west; avoid north-eastGroup them with the kitchen plumbing to save cost.
StaircaseSouth, west or south-westPlacing it along a side wall keeps the centre of the house open.
Centre of the houseKept open and unclutteredAn open centre helps light and air move through the house.
Water storageUnderground in the north-east; overhead tank in the south-westCheck with your engineer that the roof can carry a full tank.

Start with your plot's facing

The direction your plot faces (where the road is) decides most of the layout. East- and north-facing plots are often preferred, but south- and west-facing homes can be planned well too — the rooms are simply arranged differently.

Most floor plans can be mirrored (flipped left to right) or rotated to suit your plot. Our free house designs are drawn with the road at the top of the plan; a designer can flip or rotate them so the kitchen, bedrooms and entrance land in the directions you prefer.

Tips for small plots

Safety first. Never change columns, beams or wall positions for Vastu reasons without asking your structural engineer.

Free house plans for your plot

Floor plans for 15×30, 20×40, 20×45, 30×40 and 30×50 ft plots — free to download as PDF.

Browse free designs ↗Find a builder