A HOME TO CALL OURS
House plan

20×40 house plan: a free 2BHK layout with parking

What fits on an 800 sq ft plot, room-by-room sizes, a free downloadable plan and a rough cost estimate.

Updated October 2026 · About 5 minutes to read · हिंदी में पढ़ें

In short: a 20×40 ft plot is 800 sq ft. On one floor it comfortably fits a 2BHK with parking (about 700 sq ft built-up). With a second floor it can become a 3BHK or 4BHK family home.

Free 20×40 ft 2BHK plan with parking. Road at the top of the plan. PDF ↓

What can you build on a 20×40 plot?

Room sizes in our free plan

SpaceSizeArea
Living room11 × 11 ft121 sq ft
Dining11 × 10 ft110 sq ft
Kitchen9 × 10 ft90 sq ft
Bedroom 113 × 10 ft130 sq ft
Bedroom 213 × 9 ft117 sq ft
Bathroom7 × 9 ft63 sq ft
Staircase7 × 10 ft70 sq ft
Parking (open)9 × 11 ft99 sq ft

Built-up (covered) area is about 701 sq ft; the parking at the front stays open. Open the plan on our free designs page or download the PDF.

Tips for a 20-foot-wide house

How much will it cost?

At 2026 rates of roughly ₹1,300–3,500 per sq ft (see our cost guide), construction of about 701 sq ft comes to roughly ₹9.1 lakh – ₹24.5 lakh. A standard finish at around ₹1,800–2,500 per sq ft is about ₹12.6 lakh – ₹17.5 lakh, plus approvals, connections and a 10–15% reserve.

Free house plans for your plot

Floor plans for 15×30, 20×40, 20×45, 30×40 and 30×50 ft plots — free to download as PDF.

Browse free designs ↗Find a builder